BULGARIAN CONSTRUCTION COSTS · PREMIUM SERVICE

What will your Bulgarian project cost to build?

Materials, labour and the costs between them.

Build an itemised cost preview in euros before commissioning a detailed Bulgarian bill of quantities (КСС). Separate contractor costs, VAT and your investment reserve.

COST PREVIEW

From quantities to a total.

ILLUSTRATIVE FIGURES — a demonstration of the calculation, not market rates or a quotation.
Item 1

Cost per unit of work · EUR excluding VAT

Item 2

Cost per unit of work · EUR excluding VAT

Item 3

Cost per unit of work · EUR excluding VAT

Up to 10 preview items. For a one-off delivery or rental, add a separate item with quantity 1. Waste applies to materials only.

Allowances and VAT

All percentages are your assumptions. Profit is a markup on direct costs plus overhead. VAT is editable; 20% is a starting value, not a tax determination.

DETAILED BOQ · PREMIUM

A construction budget you can question and compare.

Use your preview to define the scope. Confirm deliverables, timing and the service fee before commissioning the work.

  1. 01

    Quantities and scope

    Work packages, units, drawings, inclusions and exclusions.

  2. 02

    Traceable rates

    Material, labour, equipment and logistics quotes with location and date.

  3. 03

    Comparable contractor bids

    The same quantities and scope, with missing items and markups visible.

  4. 04

    Decision documents

    Specify the BoQ, formats, alternatives and deadlines you need in the brief.

How is the total calculated?

Each work item multiplies its quantity by the material, labour, equipment, transport and other unit rates. Waste increases materials only. Overhead is added to direct costs, then profit, then VAT. Contingency is a separate budget line.

The calculator uses the rates you enter. An automatic verified regional rate database and drawing-based quantity takeoff are not connected yet.